Demand response means your business agrees to reduce electricity use when the grid is strained, usually in exchange for a payment. In Texas, that includes ERCOT programs such as Emergency Response Service, utility load management programs from Oncor and CenterPoint Energy, and cutting use during summer 4CP peaks. PowerHouse Energy helps you check whether you qualify and get enrolled.
What is demand response?
Demand response is a deal between your business and the grid. When electricity demand is very high, or a power plant trips offline, the grid needs either more supply or less use. Demand response is the "less use" side. Businesses that agree to reduce use for a short period, when asked, can get paid for being ready and for doing it.
You stay connected the whole time. Reducing use might mean turning down air conditioning a few degrees, pausing a production line, shifting a pumping schedule, or running a backup generator for an hour or two. The key is that the reduction can be measured against your normal use.
The grid gets tight
A hot afternoon, a cold snap or a plant going offline pushes demand close to supply.
You cut use for a short time
Turn down equipment or switch to a backup generator for the agreed period. You stay connected.
You can get paid
Programs pay for being ready and for the reduction, measured against your normal use.
Why does demand response matter in Texas?
Most of Texas runs on its own power grid, managed by ERCOT. Demand peaks on hot summer afternoons and during hard winter cold snaps. When supply gets tight, ERCOT and the local utilities call on businesses that have agreed to cut use, which helps keep the lights on for everyone and lowers the chance of rotating outages.
For your business, that creates windows of opportunity: you can get paid to reduce use during a handful of events each year, and, for larger accounts, lower peak charges by watching a few key summer intervals.
What demand response programs are available to Texas businesses?
These are the main options. Rules and payment rates change from year to year, so we always check each program's current terms before recommending it.
- minutes of notice in many programs
- 10-30
- minutes of notice in many programs
- Oncor 2026 minimum per project
- 100 kW
- Oncor 2026 minimum per project
- CenterPoint Energy minimum
- 50 kW
- CenterPoint Energy minimum
- summer peak intervals behind 4CP charges
- 4
- summer peak intervals behind 4CP charges
| Option | Run by | What you agree to do | Who it suits |
|---|---|---|---|
| ERCOT Emergency Response Service (ERS) | Statewide grid operator, ERCOT | Reduce use or start backup generation within 10 or 30 minutes when ERCOT calls an event. | Arranged through a Qualified Scheduling Entity (QSE), which ERCOT pays. |
| ERCOT Load Resources | Statewide grid operator, ERCOT | Loads that can change use on ERCOT's instruction and provide reserve services. | Needs a qualified QSE and a qualification test. Usually suits large, flexible loads. |
| Oncor Commercial Load Management | Oncor (North and Central Texas) | Curtail an agreed amount within 30 minutes during summer grid emergencies and a test event. | At least 100 kW per project in 2026. Enrolled through a service provider or aggregator. |
| CenterPoint Energy Commercial Load Management | CenterPoint Energy (Houston area) | Shed load within 30 minutes during test events and unscheduled events. | At least 50 kW. Needs an interval data recorder or smart meter. |
| 4CP peak reduction | Not a program; a billing method | Cut use during the four summer ERCOT peak intervals. | Matters most for larger accounts whose transmission charge is based on 4CP demand. |
ERCOT Emergency Response Service (ERS)
Emergency Response Service is ERCOT's program for emergencies. ERCOT selects qualified loads and generators, including groups of smaller sites, that agree to reduce use or increase generation within 10 or 30 minutes when called. ERCOT pays Qualified Scheduling Entities (QSEs), which make the arrangements with commercial and industrial participants. ERCOT buys ERS for set contract periods through the year.
ERCOT Load Resources
Load Resources are customers registered with ERCOT whose load can change in response to an ERCOT instruction. They can qualify to provide reserve services that help balance the grid. Each one needs a qualified QSE, and taking part in the reserve markets requires a qualification test. This option usually fits large loads that can respond quickly and reliably.
Utility load management programs
Texas utilities also run their own commercial load management programs as part of their energy efficiency programs, under rules set by the PUCT.
- Oncor. The 2026 Commercial Load Management Standard Offer Program manual covers commercial customers served by Oncor. Projects must be able to reduce at least 100 kW within 30 minutes of notice during the summer period, with a scheduled test event that normally takes place in June. Oncor pays incentives to service providers and aggregators that work with commercial customers, and the manual lists a maximum of $35 per kW for 2026.
- CenterPoint Energy. The Commercial Load Management program is open to non-residential, government and non-profit customers in CenterPoint's Houston electric territory. Participants must be able to shed at least 50 kW within 30 minutes of notice and need an interval data recorder or smart meter. CenterPoint says participants can earn up to $40 per kW of verified curtailed load.
If your business is served by another utility, such as AEP Texas or TNMP, we will check what is currently offered in your area.
What is 4CP and how can it lower peak charges?
4CP stands for the four coincident peaks. These are the four 15-minute intervals with the highest total demand on the ERCOT grid, one in each of June, July, August and September. Under PUCT Substantive Rule 25.192, transmission costs in ERCOT are shared based on the previous year's average demand during those four intervals. ERCOT publishes the 4CP calculations each year.
Utilities pass those costs on. For many larger commercial accounts, especially those with interval data meters, the transmission charge on the bill is based on the account's own demand during those four intervals. If you can cut use during them, you can lower peak charges on transmission for the following year. Your utility's tariff sets which accounts are billed this way.
Nobody knows the exact peak intervals in advance, so businesses that do this usually reduce use on the hottest afternoons when a peak looks likely. One note: the PUCT is reviewing how transmission costs are shared, so the 4CP method could change. We will tell clients if and when anything changes. For more on summer peaks, see energy risk management.
Does my business qualify for demand response?
These questions decide most of it:
How much load can you reduce?
Programs set minimums, such as 100 kW for Oncor's 2026 program and 50 kW for CenterPoint's. Smaller sites can sometimes take part through an aggregator that groups several sites.
How fast can you respond?
Many programs give 10 to 30 minutes of notice.
Can the reduction be measured?
Most programs need interval data or a smart meter so the reduction can be checked against your normal use.
Is the load safe to reduce?
Loads where a curtailment would cause health or safety problems are generally excluded.
Does your contract allow it?
Oncor's manual excludes load whose retail electric provider contract prevents curtailment, and programs often bar enrolling the same load in two programs at once.
In general, the best fits are sites with large loads they can pause, shift or cover with a backup generator for a few hours, such as process equipment, pumps or big cooling systems. Every site is different, though, so the real answer comes from your usage data.
How does PowerHouse Energy help with demand response?
We offer demand response as one of our core services, alongside electricity procurement. Here is how we help:

We look at your usage
We review your bills and interval data to see your peaks and how much load you might be able to reduce.
We check your contract
We make sure your electricity contract allows you to take part, and that nothing you are already enrolled in conflicts.
We find the programs that fit
We explain the options for your utility area in clear, everyday language, including notice times, event rules and what you would be agreeing to.
We help you get enrolled
We help you with the paperwork and connect you with the right program or provider.
You decide whether to take part. When you call, a real person answers live. If you request a callback, we call back within 10 minutes during business hours. Have a recent bill handy and our Concierge Team can start with your ESI ID and usage.
